Mining
Mining operations are carried out under contract by
Somadex, which is a subsidiary of DTP Terrassement,
the mining arm of the French construction company
Bouygues. An alliance agreement which incorporates
the principle of sharing the potential savings achieved
by the contractor using agreed productivity assumptions
and allowing for an agreed return has produced
successes particularly in the improvement of productivity.
During the year, the smaller mining fleet brought to site
to assist with mining in 2004 was decommissioned as
a result of the increased productivity.
The mine to mill project continued with the powder factor,
blast patterns and blast initiation all being improved
during the year. This has resulted in better fragmentation.
In the third quarter of the year, Somadex staff embarked
on an unprocedural strike which was subsequently
declared illegal. Total tonnes mined for the third quarter
of 2005 were negatively affected by the strike. However
by focusing on mining ore and blending from the higher
grade stockpile ore, overall gold production was
maintained. The strike was over by the fourth quarter
and the mining team was able to achieve the annual
budgeted total tonnes mined.
Ore processing
Mechanical failures and bottlenecks associated with the
expanded plant continued to negatively affect plant
throughput during the year. Randgold Resources worked
with AngloGold Ashanti to understand and address the
issues and the strategy of aiming for a gradual but
sustainable increase in throughput appears to be working.
This was evidenced by the increase during throughput
during the second half of the year, which was 10% higher
on average than in the first half.
Mineral resources
The mineral resource base estimated for the mine using
the results from infill drilling programmes as well as
resource extension drilling, depleted to the end of 2005,
is shown below:
MORILA
Attri-
MINERAL RESOURCES
butable
Tonnes
Tonnes
Grade
Grade
Gold
Gold
gold
(Mt)
(Mt)
(g/t)
(g/t)
(Mozs)
(Mozs)
(40%)
Category
2005
2004
2005
2004
2005
2004
(Mozs)
Morila
Measured
20.06 17.32
2.73 2.95 1.76 1.64
Indicated
14.01 11.96
3.00 3.56
1.35 1.37
Sub-total Measured
and indicated
34.07 29.28 2.84
3.20 3.11 3.01 1.24
Inferred
3.78 4.47
3.19
3.79 0.39
0.54 0.16
As a result of resource extension drilling in the south of the pit and in the pit wall (“the Tonalite extension”) as well as
in the north west of the pit, the mine has been successful in replacing all but a small portion of the resources depleted
by mining last year.
Cut-off grade for resources = 1g/t.
Resources are reported within the US$475 per ounce pit shell.
MORILA
Attri-
ORE RESERVES
butable
Tonnes
Tonnes
Grade
Grade
Gold
Gold
gold
(Mt)
(Mt)
(g/t)
(g/t)
(Mozs)
(Mozs)
(40%)
Category
2005
2004
2005
2004
2005
2004
(Mozs)
Morila
Proved 15.95
11.92 3.21
3.39 1.65
1.30
Probable
6.19 13.87 3.63 2.87 0.72 1.28
Sub-total Proved
and
probable 22.14 25.79 3.33
3.11 2.37
2.58 0.95
Pit optimisation carried out at a price of US$425 per ounce.
Dilution of 10% and ore loss of 5% are incorporated into the calculation of reserves.
Cut-off grade of 1.4g/t.
Stockpiled ore included.
See comments
and US disclaimer on page 65.
20 Annual
Report 2005 Randgold Resources